Maintenance

August 2025


University of Oklahoma performed maintenace on NISAR CRs N06K, N07K, N08K on Saturday, August 23rd, 2025, and on CRs N01K, N02K, N03K, N04K, N05K on Sunday August 24th, 2025. Lake McMurtry(N09K) and Gutherie(N10K) were not includind in this mainenance pass or any of the southern region CRs which include N11K, N12K, N13K, N14K, N15K, N16K, or N17K.

N01K (Arapaho East, 2.8-m west-facing CR)

Fence was powered on. Removed vegetation from inside CR also.
NISAR N01K, East facing
After (August 24, 2025)

N02K (Foss South, 2.8-m west-facing CR)

NISAR Foss South, West facing
Before
 
 
NISAR Foss South, West facing
After (August 24, 2025)

N03K (Arapaho West, 2.8-m east-facing CR)

Fence was powered on. Removed vegetation from inside CR also.
NISAR N03K, West facing
Before
 
 
NISAR N03K, East facing
After (August 24, 2025)

N04K (Foss North, 2.8-m east-facing CR)

NISAR_Foss_North, East facing
Before
 
 
NISAR Foss North, East facing
After (August 24, 2025)

N05K (Washita, 2.8-m west-facing CR)

Substantial vegetation surrounding the reflector since May, 2025. Fence was powered on.
NISAR N05K, West facing
Before
 
 
NISAR N05K, West facing
After (August 24, 2025)

N06K (Putnam, 2.8-m west-facing CR)

Fence was powered on, guywires taught, though one was missing and replaced. Vegetation removed from inside the CR.
NISAR N06K, West facing
Before
 
 
NISAR N06K, West facing
After (August 23, 2025)

N07K (Lahoma, 2.8-m west-facing CR)

NISAR N07K, West facing
Before
 
 
NISAR N07K, West facing
After (August 23, 2025)

N08K (Blackwell, 2.8-m west-facing CR)

Substantial vegetation since May, 2025. At least one duckbill had rusted away and was replaced by a stake at 45 degree angle.
NISAR N08K, West facing
Before
 
 
NISAR N08K, West facing
After (August 23, 2025)