Deployment History

Dec 15 & 16, 2021


 
 

N01K and N03K
Removed all prior fencing and tall grasses. Reconstructed N01K and N03K with cap blocks as bases which elevated the CRs 1 5/8" in height. Erected 8.6 kV electric fences with two lines of polywire each and energized with solar chargers. Restaked aft guy-wires and replaced all side stakes with duck-bill anchors. Did not redo metrology but rather adjusted prior coordinates in vertical due to the offsets introduced by the cap blocks. There is non-trivial sagging of both bottom panels as this was necessary at this time to reduce oscillations in strong wind conditions. Future maintenance will reinforce the bottom panel and move the forward platform stands out toward the edges. This should reduce the sagging of the bottom panel. When this maintenance is performed, we will redo the full metrology of these CRs.

 
 

December 15, 2021

 
 
Reconstructed NISAR N01K elevated at 14.26 degrees, East facing
Reconstructed East Facing CR N01K, December 15, 2021
 
 
Reconstructed NISAR N03K elevated at 14.33 degrees, West facing
Reconstructed West Facing CR N03K, December 14, 2021
 
 

December 16, 2021

 
 

N02K and N04K
Installed new NISAR corners N02K and N04K. Both these corners have a reinforced bottom panel and due to placement of the front stands, sagging of the bottom panels is greatly reduced. Erected 8.6 kV electric fences with two lines of polywire each and energized with solar chargers. Completed full metrology on these reflectors. Used SWOT Eastern Reference site (SEOT) to perform RTK to N04K with 4 hours of GPS data, and RTK to N02K with 1.5 hours of GPS data.

 
 
 
 
NISAR N02K elevated at 12.55 degrees, West facing
Newly Constructed West Facing CR N02K, December 16, 2021
 
 
NISAR N04K elevated at 16.60 degrees, East facing
Newly Constructed East Facing CR N04K, December 16, 2021